Installed Sales > Materials

The Materials tab lists all materials associated with the Installed Contract (originating from orders and tickets). Materials cannot be directly added to a contract. Tickets and orders must be used to associate materials with a contract. Any "Labor" type items are excluded from the material's grid and are reflected on the Labor tab instead. This tab shows the ordered quantity for each item as well as the quantity that has been ticketed.

Installed_Materials